The electrical fault on the static frequency converter has been solved at Severn U20, and the unit is resuming full MEL @ 400 mw from 11:45 GMT.
DONG Energy A/S - UK - Severn U20 to resume full MEL from 11:45 GMT
2012-02-18T11:45:36.0000000Z
2012-02-18T11:45:36.0000000Z
The electrical fault on the static frequency converter has been solved at Severn U20, and the unit is resuming full MEL @ 400 mw from 11:45 GMT.