Done with foundations at Borkum Riffgrund 1

Last week, all 77 monopile foundations were successfully installed at the offshore wind farm Borkum Riffgrund 1 in the German North Sea.

Installation was carried out using a noise mitigation system to lower the impact on adjacent marine life. It is the first time ever that this system has been used this way.

Icon of iPhone

For additional information, contact Media Relations 

Morten Kidal +45 9955 9583