As the global leader in offshore wind, in 2018 we expanded into the onshore wind industry. We currently operate 3.7 GW of onshore wind assets across the US and Europe, with a further 110 MW under construction.

Find out more about each of our onshore wind projects below.

Onshore wind farms in Germany
  • Bahren West 1

    Status: Under construction

    Location: Brandenburg

    Number of turbines: 9

    Overall capacity: 50.4 MW

    Turbine type: Vestas V150 5.6 MW

    Expected commissioning: 2024

    Ownership: Ørsted 100 %

  • Granswang

    Status: In operation

    Number of wind turbines: 3

    Overall capacity: 9.15 MW

    Turbine type: E101 3.05 MW

    In commercial operation since: 2016

    Ownership: Ørsted 50%

  • Rotmainquelle

    Status: In operation

    Location: Bavaria, Creussen

    Number of turbines: 5

    Overall capacity: 15 MW

    Turbine type: E115 3.0 MW

    In commercial operation since: 2016

    Ownership: Ørsted 100%

  • Schiederhof

    Status: In operation

    Location: Bavaria, Wiesenfelden

    Number of turbines: 2

    Overall capacity: 6.9 MW

    Turbine type: V136 3.45 MW

    In commercial operation since: 2018

    Ownership: Ørsted 100%

  • St. Wendel

    Status: Under construction

    Location: St. Wendel, Northeast Saarland

    Number of turbines: 3

    Overall capacity: 16.8 MW

    Turbine type: Vestas V162 5.6 MW

    Target to enter commercial operation: 2025

    Ownership: Ørsted 100%

Onshore wind farms in Ireland & Northern Ireland
  • Amazon Wind Farm Northern Ireland – Ballykeel

    Status: In operation

    Location: Ballykeel and Old Freehold townlands on the outskirts of Larne, Co. Antrim, Northern Ireland. 

    Number of turbines:

    Overall capacity: 16 MW 

    In commercial operation since: 2023 

    Ownership: Ørsted 100%

  • Ballinagree

    Status: In development

    Location: County Cork, Republic of Ireland

    Partners: 50:50 partnership with Coillte

    Capacity (Ørsted and Coillte): 106.4 MW

    Target to enter commercial operation: 2026

    Read more at https://www.ballinagreewindfarm.ie/

  • Ballymartin

    Status: In operation

    Location: 7 km west of Mullinavat, County Kilkenny, Republic of Ireland, alongside the Smithstown wind farm

    Number of turbines: 3

    Overall capacity: 6.9 MW

    In commercial operation since: 2011

    Ownership: Ørsted 100%

  • Booltiagh 1

    Status: In operation

    Location: 15 km west of Ennis, County Clare, Republic of Ireland, along with Booltiagh 2

    Number of turbines: 12

    Overall capacity: 18 MW

    In commercial operation since: 2005

    Ownership: Ørsted 100%

  • Booltiagh 2

    Status: In operation

    Location: 25 km north-west of Cashel, County Tipperary, on the same site as Booltiagh 1

    Number of turbines: 6

    Overall capacity: 12 MW

    In commercial operation since: 2013

    Ownership: Ørsted 100%

  • Coom

    Status: In development

    Location: County Cork, Republic of Ireland

    Partners: 50:50 partnership with Coillte

    Capacity (Ørsted and Coillte): 105.6 MW

    Target to enter commercial operation: 2026

    Read more at https://coomgreenenergy.com/

  • Craignagapple

    Status: In development

    Location: County Tyrone

    Overall capacity: From 50 MW to 77 MW

    Target to enter commercial operation: 2028

    Read more at www.craignagapplewindfarm.com

  • Farranrory

    Status: Under construction

    Location: County Tipperary

    Number of turbines: 9

    Overall capacity: 43 MW

    Target to enter commercial operation: 2026

    Ownership: Ørsted 100%

    Read more at https://www.farranrorywindfarm.com/ 

  • Flughland

    Status: In operation

    Location: 44 km west of Letterkenny, County Donegal, Republic of Ireland, close to Sorne 1 and Sorne 2

    Number of turbines: 4

    Installed capacity: 9.2 MW

    In commercial operation since: 2009

    Ownership: Ørsted 100%

  • Garracummer

    Status: In operation

    Location: 25 km north-west of Cashel, County Tipperary, Republic of Ireland

    Number of turbines: 17

    Installed capacity: 42.5 MW

    In commercial operation since: 2013

    Ownership: Ørsted 100%

  • Gneeves

    Status: In operation

    Location: 6 km south-west of Millstreet, County Cork, Republic of Ireland

    Number of turbines: 8

    Installed capacity: 9.4 MW

    In commercial operation since: 2006

    Ownership: Ørsted 100%

  • Inchincoosh

    Status: In operation

    Location: 7 km north of Kilgarvan village in County Kerry, Republic of Ireland (extension of Kilgarvan, along with Sillahertane)

    Number of turbines: 13

    Installed capacity: 32.5 MW

    In commercial operation since: 2009

    Ownership: Ørsted 100%

  • Kilgarvan

    Status: In operation

    Location: 7 km north of Kilgarvan village in County Kerry, Republic of Ireland

    Number of turbines: 15

    Installed capacity: 45 MW

    In commercial operation since: 2007

    Ownership: Ørsted 100%

  • Knockawarriga 1

    Status: In operation

    Location: 12 km south-east of Abbeyfeale in County Limerick, Republic of Ireland

    Number of turbines: 9

    Installed capacity: 22.5 MW

    In commercial operation since: 2008

    Ownership: Ørsted 100%

  • Knockawarriga 2

    Status: In operation

    Location: 12 km south-east of Abbeyfeale in County Limerick, Republic of Ireland

    Number of turbines: 3

    Installed capacity: 7.5 MW

    In commercial operation since: 2020

    Ownership: Ørsted 100%

  • Lisheen 1

    Status: In operation

    Location: 10 km east south-east of the town of Templemore, County Tipperary, Republic of Ireland

    Number of turbines: 18

    Installed capacity: 36 MW

    In commercial operation since: 2009

    Ownership: Ørsted 100%

  • Lisheen 2

    Status: In operation

    Location: 10 km east south-east of the town of Templemore, County Tipperary (extension of Lisheen1)

    Number of turbines: 12

    Installed capacity: 24 MW

    In commercial operation since: 2013

    Ownership: Ørsted 100%

  • Lisheen 3

    Status: In operation

    Location: 3 km west of Crosspatrick village, spanning County Laois and County Kilkenny (extension of Lisheen 1 & 2)

    Number of turbines: 8

    Installed capacity: 28.8 MW

    In commercial operation since: 2023

    Ownership: Ørsted 100%

  • Mienvee

    Status: In operation

    Location: Holyford, County Tipperary, Republic of Ireland, within Garracummer wind farm.

    Number of turbines: 1

    Installed capacity: 0.9 MW

    In commercial operation since: 2004

    Ownership: Ørsted 100%

  • Owenreagh 1

    Status: In operation

    Location: County Tyrone, Northern Ireland, along with Owenreagh 2

    Number of turbines: 9

    Installed capacity: 2.5 MW

    In commercial operation since: 1997

    Ownership: Ørsted 50%

  • Owenreagh 2

    Status: In operation

    Location: County Tyrone, Northern Ireland, along with Owenreagh 1

    Number of turbines: 6

    Installed capacity: 2.6 MW

    In commercial operation since: 2008

    Ownership: Ørsted 50%

  • Sillahertane

    Status: In operation

    Location: 7 km north of Kilgarvan village in County Kerry, Republic of Ireland (extension of Kilgarvan, along with Inchincoosh)

    Number of turbines: 10

    Installed capacity: 8.5 MW

    In commercial operation since: 2009

    Ownership: Ørsted 100%

  • Smithstown

    Status: In operation

    Location: County Kilkenny, Republic of Ireland

    Number of turbines: 4

    Installed capacity: 8 MW

    In commercial operation since: 2013

    Ownership: Ørsted 100%

  • Sorne 1

    Status: In operation

    Location: 9 km east of Buncrana, County Donegal, Republic of Ireland, together with Sorne 2, close to Flughland

    Number of turbines: 16

    Installed capacity: 32 MW

    In commercial operation since: 2006

    Ownership: Ørsted 100%

  • Sorne 2

    Status: In operation

    Location: 9 km east of Buncrana, County Donegal, Republic of Ireland, close to Flughland (extension of Sorne 1)

    Number of turbines: 3

    Installed capacity: 6.9 MW

    In commercial operation since: 2009

    Ownership: Ørsted 100%

Onshore wind farms in the UK 
  • Kennoxhead phase 1

    Status: In operation

    Location: Near Glespin, South Lanarkshire, Scotland

    Number of turbines: 13

    Installed capacity: 62 MW

    In commercial operation since
    : 2022

    Ownership: Ørsted 100%

    Read more at https://kennoxheadwind.co.uk

  • Kennoxhead phase 2

    Status: In development

    Location: Near Glespin, South Lanarkshire, Scotland

    Number of turbines: 14

    Installed capacity: 112 MW

    Target to enter commercial operation: 2024

    Read more at https://kennoxheadwind.co.uk

  • Larbrax

    Status: In development

    Location: Rhins Peninsula, Dumfries & Galloway, Scotland

    Number of turbines: 5

    Installed capacity: 20 MW

    Target to enter commercial operation: 2026

    Read more at https://larbraxwindfarm.co.uk

Onshore wind farms in the US 
  • Dermott Wind

    Status: In operation

    Location: Scurry County, Texas

    Number of turbines: 110

    Capacity: 253 MW

    Turbine type: GE 2.3 MW

    In commercial operation since: 2017

    Ownership: Ørsted 100%

  • Ford Ridge

    Status: In operation 

    Location: Ford County, Illinois 

    Number of turbines: 43 

    Capacity: 121 MW 

    Turbine type: GE-2.82 

    In commercial operation since: 2022 

    Ownership: Ørsted 100%

  • Haystack Wind Farm

    Status: In operation

    Location: Wayne County, Nebraska

    Number of turbines: 69

    Capacity: 298 MW

    Turbine type: Siemens 2.4 MW and 5 MW

    In commercial operation since: 2022

    Ownership: Ørsted 100%

  • Helena Energy Center

    Status: In operation 

    Location: Bee County, Texas

    Number of turbines: 66

    Capacity of wind farm component: 268 MW

    Turbine type: Vestas V-4.2 and V-3.6

    In commercial operation since: 2022

    Ownership: Ørsted 100%

    The 518 MWAC Helena Energy Center comprises co-located wind and solar generation. 

  • Lincoln Land Wind

    Status: In operation

    Location: Morgan County, Illinois

    Number of turbines: 107

    Overall capacity: 302 MW

    In commercial operation since:   2021

    Ownership: Ørsted 100%

  • Lockett Wind

    Status: In operation

    Location: Near Vernon, Wilbarger County, Texas

    Number of turbines: 75

    Overall capacity: 184 MW

    Turbine type: GE 2.45 MW

    In commercial operation since: 2019

    Ownership: Ørsted 100%

  • Plum Creek Wind 

    Status: In operation

    Location: Wayne County, Nebraska

    Number of turbines: 82

    Capacity: 230 MW

    Turbine type: GE 2.8 MW

    In commercial operation since: 2020

    Ownership: Ørsted 100%

    Read more at https://plumcreekwindenergy.com

  • Sage Draw Wind

    Status: In operation

    Location: Garza and Lynn County, Texas

    Number of turbines: 120

    Overall capacity: 338 MW

    Turbine type: GE 2.82MW

    In commercial operation since: 2020

    Ownership: Ørsted 100%

  • Sunflower Wind

    Status: In operation 

    Location: Marion County, Kansas 

    Number of turbines: 76 

    Capacity: 201 MW 

    Turbine type: GE-2.82 

    In commercial operation since: 2023 

    Ownership: Ørsted 100%

  • Tahoka Wind

    Status: In operation

    Location: Lynn County, Texas

    Number of turbines: 120

    Overall Capacity: 300 MW

    Turbine type: GE 2.5 MW

    In commercial operation since: 2018

    Ownership: Ørsted 100%

  • Western Trail Wind Farm

    Status: In operation

    Location: Wilbarger County, Texas

    Number of turbines: 130

    Overall Capacity: 367 MW

    Turbine type: GE 2.82 MW

    In commercial operation since: 2021

    Ownership: Ørsted 100%

  • Willow Creek Wind

    Status: In operation

    Location: Butte County, South Dakota

    Number of turbines: 38

    Capacity: 103 MW

    Turbine type: 2.3 MW and 2.78 MW

    In commercial operation since: 2020

    Ownership: Ørsted 100%

  • Willow Springs Wind

    Status: In operation

    Location
    : Haskell County, Texas

    Number of turbines: 100

    Capacity: 250 MW

    Turbine type: GE 2.5 MW

    In commercial operation since: 2017

    Ownership: Ørsted 100%