As a global leader in renewable energy, we’ve built more offshore wind farms than any other developer in the world – including the world’s first and the world’s largest. Our wind farms can be found all over the world, off the coasts of Europe, the US, and the Asia-Pacific region. And our global footprint continues to grow. On top of the 8.9 GW of offshore wind we’ve installed, we have a further 10.3 GW either under construction or awarded.   

Find out more about each of our offshore projects below. You can also access our operational and meteorological offshore wind farm data. We offer this data to help research, education and development in green energy.
Wind farms in Denmark
  • Anholt
    Status: In operation
    Overall capacity: 400 MW
    Number of turbines: 111
    Wind turbine capacity: 3.6 MW
    Rotor diameter: 120 metres
    In commercial operation since: 2013
    Location: between Djursland and the island of Anholt in the Kattegat.
    Ørsted ownership share: 50%
    Partners: Pension Danmark, AIP Management
    Map showing the location of Anholt Offshore Wind Farm.
  • Avedøre
    Status: In operation
    Overall capacity: 7.2 MW
    Number of turbines: 2
    Wind turbine capacity: 3.6 MW
    Rotor diameter: 120 meters
    Construction period: 2009-2011
    Location: Avedøre Power Station at Avedøre Holme
    Ørsted ownership share: 100%
  • Horns Rev 1
    Status: In operation
    Overall capacity: 160 MW
    Number of turbines: 80
    Wind turbine capacity: 2 MW
    Construction period: 2002
    Location: North Sea, 14 km off the Danish west coast
    Ørsted ownership share: 40%
    Partners: Vattenfall
  • Horns Rev 2
    Status: In operation
    Overall capacity: 209 MW
    Number of turbines: 91
    Wind turbine capacity: 2.3 MW
    Rotor diameter: 93 metres
    Construction period: 2008-2009
    Location: 30 km off the Danish west coast from Esbjerg
    Ørsted ownership share: 100%
    Map showing the location of Horns Rev 2 Offshore Wind Farm.
  • Nysted
    Status: In operation
    Overall capacity: 165.6 MW
    Number of turbines: 72
    Wind turbine capacity: 2.3 MW
    Rotor diameter: 82.4 metres
    Construction period: 2003
    Location: 10 km south of Nysted and around 13 km west of Gedser
    Ørsted ownership share: 42.7%
    Partners: Stadtwerke Lübeck and PensionDanmark
Wind farms in Germany
  • Borkum Riffgrund 1
    Status: In operation
    Overall capacity: 312 MW
    Number of turbines: 78
    In commercial operation since: 2015
    Ørsted ownership share: 50%
    Partners: Greencoat Renewables
    Map showing the location of Borkum Riffgrund 1 Offshore Wind Farm.
  • Borkum Riffgrund 2
    Status: In operation
    Overall capacity: 450 MW
    Number of turbines: 56
    In commercial operation since: 2018
    Ørsted ownership share: 50%
    Partners: Gulf Energy, Keppel Infrastructure Trust ("KIT")
    Map showing the location of Borkum Riffgrund 2 Offshore Wind Farm.
  • Borkum Riffgrund 3

    Status: Under construction
    Overall capacity: 913 MW
    Number of turbines: 83
    Location: in the German North Sea, adjacent to Ørsted's existing offshore wind farms Borkum Riffgrund 1 and Borkum Riffgrund 2
    Ørsted ownership share: 50%
    Partners: Glennmont Partners

    Borkum Riffgrund 3 is expected to be fully commissioned in 2025. It comprises three offshore wind projects which were originally awarded to Ørsted in auctions in 2017 and 2018 under the names of Borkum Riffgrund West 1, Borkum Riffgrund West 2 and OWP West. The three projects were renamed in September 2019 and will be built as one joint project under the name of Borkum Riffgrund 3.

    Borkum Riffgrund 3 was awarded without subsidies to Ørsted. A number of companies across IT, retail and the chemicals industry have signed corporate power purchase agreements for Borkum Riffgrund 3.


  • Gode Wind 1 & 2

    Status: In operation
    Overall capacity: 582 MW
    Number of turbines: 97
    In commercial operation since: 2016
    Ørsted ownership share: 50%
    Partners (Gode Wind 1): Glennmont Partners, The Renewables Infrastructure Group Limited (TRIG)
    Partners (Gode Wind 2): AIP, Industriens Pension, Lærerenes Pension, Lægernes Pensionskasse

    Map showing the location of Gode Wind 1 & 2 Offshore Wind Farm.
  • Gode Wind 3

    Status: Under construction
    Overall capacity: 253 MW
    Number of turbines: 23
    Location: in the German North Sea
    Ørsted ownership share: 100%

    Gode Wind 3 offshore wind farm is expected to be fully commissioned in 2024. It comprises two offshore wind projects which were originally awarded to Ørsted in auctions in 2017 and 2018 under the names of Gode Wind 3 and Gode Wind 4. The two projects were renamed in September 2019 and will be built as one joint project under the name of Gode Wind 3.

Wind farms in the Netherlands
  • Borssele 1&2
    Status: In operation
    Overall capacity: 752 MW
    Number of turbines: 94
    In commercial operation since: 2020
    Ørsted ownership share: 50%
    Partners: Norges Bank Investment Management (NBIM)
    Borssele 1+2
Wind farms in Poland
  • Baltica 2 & 3

    Status: Awarded
    Capacity: Baltica 2 (1,498 MW), Baltica 3 (1,255 MW)
    Expected commissioning: Baltica 2 (2027), Baltica 3 (2029)

    Baltica 2 & 3 are being developed in a 50/50 partnership with the Polish energy company PGE. Baltica 2 & 3 will contribute significantly to Poland’s green energy transition, accelerate the development of the local supply chain and spur economic activity for many years to come.

    Find out more by visiting the Baltica 2 & 3 project website

Wind farms in Taiwan
  • Formosa 1
    Status: In operation
    Capacity: 128 MW
    Location: 2-6 km off the coast of Miaoli County
    In commercial operation since: 2017
    Ørsted ownership share: 35%
    Partners: JERA, Swancor Renewables, Mitsui Osk Lines (M.O.L.), Hokuriku Electric Power Company
    Map showing the location of Formosa 1 Offshore Wind Farm.
  • Greater Changhua 1 & 2a

    Status: Under construction
    Capacity: 900 MW
    Location: 35-50 km off the coast of Changhua County
    Construction: 2021 and 2022
    Ørsted ownership share of Changhua 1: 50%
    Partners: CDPQ & Cathay Private Equity
    Ørsted ownership share of Changhua 2a: 100%

    Changhua 1 and 2a will have enough capacity to supply around 1 million Taiwanese households with green power.


  • Changhua 2b & 4

    Status: Awarded 
    Capacity: 920 MW 
    Location: Off the coast of Changhua County 
    Expected commissioning: 2025/2026

    In June 2018, Ørsted was awarded the right to build another 920 MW offshore wind in Taiwan through its Changhua 2b and 4 sites. Changhua 2b and 4 are to be built in 2025. 

  • Greater Changhua 3

    Status: In development 

    We have four offshore wind sites off the coast of Changhua County which can be developed into a total capacity of approx. 2,400 MW. In 2018, we won two offshore wind auctions with these projects, which means that we will build 2 x 900 MW in 2021 and 2025. The remaining 600 MW can participate in future auction rounds. Fully utilised, the Changhua projects could jointly power approx. 2.8 million Taiwanese households. 

    Map showing the location of Greater Changhua 3 Offshore Wind Farm.
  • Wo Neng 1, 2

    Status: In development
    Potential capacity: 3 GW
    Location: minimum 42 km off the coast of Taichung

  • Xu Feng 1, 2, 3

    Status: In development
    Potential capacity: 2.1 GW
    Location: 37-62 km off the coast of Changhua County

Wind farms in the UK
  • Barrow
    Status: In operation
    Number of turbines: 30
    Overall capacity: 90 MW
    In commercial operation since: 2006
    Location: Northwest coast of England
    Ørsted ownership share: 100%
    Map showing the location of Barrow Offshore Wind Farm.
  • Burbo Bank
    Status: In operation
    Number of turbines: 25
    Overall capacity: 90 MW
    In commercial operation since: 2007
    Location: Burbo Flats, 6.4 km from the Sefton coastline and 7.2 km from North Wirral
    Ørsted ownership share: 100%
    Map showing the location of Burbo Bank Offshore Wind Farm.
  • Burbo Bank Extension

    Status: In operation
    Overall capacity: 258 MW
    Number of turbines: 32
    In commercial operation since: 2017
    Location: Burbo Flats in Liverpool Bay, approximately 7 km north of the North Wirral
    Ørsted ownership share: 50%
    Partners: LEGO (Kirkbi), Greencoat

    Watch a video about Burbo Bank Extension

    Map showing the location of Burbo Bank Extension Offshore Wind Farm.
  • Gunfleet Sands 1 & 2
    Status: In operation
    Number of turbines: 48
    Overall capacity: 173 MW
    In commercial operation since: 2010
    Location: 7 km southeast of Clacton-on-Sea, Essex
    Ørsted ownership share: 50.1%
    Partners: JERA, Development Bank of Japan (DBJ)
    Map showing the location of Gunfleet Sands Offshore Wind Farm.
  • Gunfleet Sands 3
    Status: In operation
    Number of turbines: 2
    Overall capacity: 12 MW
    In commercial operation since: 2013
    Ørsted ownership share: 100%
  • Hornsea 1

    Status: In operation
    Overall capacity: 1218 MW
    Number of turbines: 174
    Wind turbine capacity: 7 MW
    In commercial operation since: 2019
    Location: in the North Sea, more than 100 km from the Yorkshire coast
    Ørsted ownership share: 50%
    Partners: Greencoat, TRIG & Equitix, GLIL & Octopus Renewables

    Find out more by visiting the Hornsea 1 project website 

    Map showing the location of Hornsea 1 Offshore Wind Farm.
  • Hornsea 2
    Status: In operation
    Overall capacity: 1320 MW
    Number of turbines: 165
    Wind turbine capacity: 8 MW
    Rotor diameter: 167 m
    In commercial operation since: 2022
    Location: approx. 89 km off the Yorkshire coast in the North Sea, adjacent to Hornsea 1
    Ørsted ownership share: 50%
    Partners: AXA IM Alts and Crédit Agricole Assurances

    Find out more about the world’s largest offshore wind farm 2022

  • Hornsea 3

    Status: Awarded
    Expected capacity: over 2,800 MW
    Location: off the North Norfolk coast in the North Sea
    Ørsted ownership share: 100%

    We’re developing Hornsea 3, which will replace Hornsea 2 as the world’s largest offshore wind farm. Hornsea 3 was awarded a contract for difference by the UK government in June 2022.

    Find out more by visiting the Hornsea 3 project website

  • Hornsea 4

    Status: In development
    Location: in the North Sea, approximately 65 km off the Yorkshire coast

    We are proposing to develop a new offshore wind farm, Hornsea 4. The project team is exploring an offshore area of up to 600km2.

    Find out more by visiting the Hornsea 4 project website

    Map showing the location of Hornsea 4 Offshore Wind Farm.
  • Isle of Man
    Status: In development

    We are currently investigating an area in the Territorial Seas of the Isle of Man. The project is at an early stage of development, and as such its final layout and size are not known. Subject to our investigations, and the outcome of future consenting processes, the wind farm could generate up to 700 MW of electricity.
  • Lincs
    Status: In operation
    Number of turbines: 75
    Overall capacity: 270 MW
    In commercial operation since: 2013
    Ørsted ownership share: 25%
    Partners: Green Investment Group (GIG), Octopus Renewables
    Map showing the location of Lincs Offshore Wind Farm.
  • Race Bank
    Status: In operation
    Overall capacity: 573 MW
    Number of turbines: 91
    In commercial operation since: 2018
    Ørsted ownership share: 50%
    Partners: Macquarie (MIRA), RE Fund by Sumitomo/SMBC/DBJ, Funds managed by Arjun and Gravis
    Map showing the location of Race Bank Offshore Wind Farm.
  • Walney
    Status: In operation
    Number of turbines: 102
    Overall capacity: 367 MW
    In commercial operation since: 2012
    Ørsted ownership share: 50%
    Partners: PGGM, Greencoat
    Walney Extension location map
  • Walney Extension

    Status: In operation
    Overall capacity: 659 MW
    Number of turbines: 87
    In commercial operation since: 2018
    Ørsted ownership share: 50%
    Partners: AIP Management, PFA


    Visit the Walney Extension project website

  • West of Duddon Sands
    Status: In operation
    Number of turbines: 108
    Overall capacity: 389 MW
    In commercial operation since: 2014
    Ørsted ownership share: 50%
    Partners: Scottish Power Renewables (Iberdrola)
  • Westermost Rough
    Status: In operation
    Number of turbines: 35
    Overall capacity: 210 MW
    In commercial operation since: 2015
    Ørsted ownership share: 50%
    Partners: Equitix, USS, Stepstone, BAE Systems Pension Funds, CLAL Insurance
    Map showing the location of Westermost Rough Offshore Wind Farm.
Wind farms in the US
  • Block Island Wind Farm

    Status: In operation
    Capacity: 30 MW
    Number of turbines: 5
    Location: Approximately 3 miles southeast of Block Island, RI
    In commercial operation since: 2016

    Find out more about America’s first offshore wind farm

    Map showing the location of Block Island Offshore Wind Farm.
  • Coastal Virginia Offshore Wind

    Ørsted completed work on the Coastal Virginia offshore wind (CVOW) project for Dominion Energy in 2020. We supported the engineering, procurement and construction work and Dominion Energy will remain the sole owner of the turbines. The two turbines are the first ever to be installed in federal waters.


    Status: In operation
    Capacity: 12 MW
    Number of turbines: 2
    Location: 27 miles off the coast of Virginia Beach
    In operation since: 2020

    Map showing the location of the Coastal Virginia Offshore Wind project.
  • Revolution Wind

    Status: Awarded
    Capacity: 400 MW to Rhode Island and 304 MW to Connecticut
    Location: More than 15 miles south of the Rhode Island coast and 32 miles southeast of the Connecticut coast
    Expected completion: 2025

    Revolution Wind is a 50/50 joint venture with our partner Eversource – New England’s largest energy company and premier electric transmission builder. This project will help two states meet their ambitious clean energy goals affordably by providing 304 MW to Connecticut and 400 MW to Rhode Island.

    Find out more about Revolution Wind

  • South Fork Wind

    Status: Under construction
    Capacity: 130 MW
    Number of turbines: 12
    Location: 35 miles east of Montauk Point
    To enter commercial operation: 2023

    South Fork Wind is a 50/50 joint venture with our partner Eversource – New England’s largest energy company and premier electric transmission builder. This offshore wind farm will be the first to connect in New York State and help the Town of East Hampton meet its 100% renewable energy goal.

    Find out more about South Fork Wind

  • Sunrise Wind

    Status: Awarded
    Capacity: 924 MW
    Location: Over 30 miles east of Long Island’s Montauk Point
    To enter commercial operation: 2025

    Sunrise Wind is a 50/50 joint venture with our partner Eversource, New England’s largest energy company and premier electric transmission builder, and with support from Con Edison and New York Power Authority (NYPA). This offshore wind project will power more than half a million homes and bring substantial economic development to the state.

    Find out more about Sunrise Wind

    Map showing the location of Ørsted's offshore wind farm Sunrise Wind.
A wind turbine in front of a dark cloud.

Offshore wind energy